What if we defined the good and the bad variability within the project?

EI&C Group

  • Intouch / Wonderware
  • iFix
  • FactoryTalk / RSView32
  • Cygnet
  • Emerson / DeltaV
  • Rockwell/AB
  • GE Fanuc
  • Siemens S7
  • Koyo
  • Automation Direct
  • Ignition
  • Advanced Process Control (Optimization and Multivariable)
  • ABB
  • Honeywell
  • Velocio
  • Building Management Systems
  • Site Walkdowns, as-builting
  • Control Valve Sizing, Flow & Level Philosophy
  • Control System Philosophy
  • Shut Down Requirements
  • Plant Info Systems Requirements
  • User Control Requirements
  • Control Benefit Study
  • System Integration Study
  • Alarm Objective Analysis
  • Integration Programming
  • Network System Architecture, Data Storage
  • Data Maps
  • I/O Mapping
  • PLC and DCS Control Programming
  • Analog Scaling
  • Data Formatting
  • Operator Interface Programming, screen design
  • Data Time Series Trending
  • Process Modeling
  • UPS Design / Test
  • Cause & Effect Matrix
  • Demolition Drawings / Construction Drawings
  • Bill of Material
  • Construction Support
  • FAT
  • Field Testing and Commissioning, thorough documented method, efficient and high quality
  • Training Manuals, and Classroom Training
  • Data Analytics
  • Statistical Analysis
  • Historian Database
  • Histograms (frequency and range of data)
  • Time Series Data (relative past performance)
  • Chi Squared (is this datapoint truly abnormal)
  • Picture of the data for remote operations best decision making
  • iiOT, html5 for use on iphone, Samsung, tablets, etc
  • Customizable action card with like / dislike and swiping feature
  • Advanced Process Control
  • Cloud service
  • Ethernet
  • Wifi
  • RF
  • Cellular
  • Security
  • Router for firewall share of data to outside party
  • Hart / Modbus
  • Wireless
  • Area Class
  • Datasheets
  • Instrument Index
  • Custody Transfer
  • Schematic,Wiring Diagram, Loop
  • Cable & Conduit Plan
  • Instrument Location Plans,
  • Installation Details,
  • Instrument Configuration
  • Flow computer
  • PLC and DCS systems, Ladder, SFC, Scripting
  • Modbus or similar to minimize field wiring, or wireless system
  • Thorough startup protocol for quality system, including validation
  • Power Drawings – One Lines, Power Distribution
  • Control Power Drawings
  • Cabinets, Junction Boxes
  • Heat Trace
  • Field Technicians and Inspectors
  • Energy cost saving measures
  • Remote power options analysis
  • Transformers
  • Distribution centers
  • Cathodic protection
  • Short circuit analysis
  • Wiring Diagram and Schematics
  • Lighting
  • Grounding
  • Area Classification Plans
  • Arc Flash Studies

    • Calculating the incident energy and arc flash boundary for each location in the power system
    • Selecting trip times from the protective device settings and arcing fault current values
    • Incident energy and arc flash boundaries will be calculated following the NFPA 70E, IEEE 1584 and NEC standards
    • Clothing requirements will be specified
    • Clearing times will be reduced based on current-limiting capabilities
    • Generate the Arc Flash Labels for the electrical equipment
    • Respective Arc Flash Report generated by SKM
    • Clearing times optimized based on current-limiting capabilities

Looking Forward

  • This next era will continue to have more edge based computing capabilities to make use of good time series data to program in decision making. Whether its operational tuning, maintenance signaling, or incident prevention, implementing these capabilities should have a solid ROI
  • Freezer Engineering LLC’s purpose is to understand the hardware capability, and apply it to your operation as the System Integrator